Step 1 of 4
Lay the first diagonal
Come up at A5 and go down at E1. Let the strand rest on the surface.
↑ Up at A5 ↓ Down at E1Hold laid diagonal strands with small crossing stitches. Changing the lean of the catches gives neighboring bands a twill-like surface.
Work the steps ↓Read letters from left to right and numbers from top to bottom. Each point names a hole. Count the threads between holes for each span.
Come up at A5 and go down at E1. Let the strand rest on the surface.
↑ Up at A5 ↓ Down at E1Come up at C7 and go down at G3. Leave two threads between the endpoints on the bottom edge.
↑ Up at C7 ↓ Down at G3Come up at B2 and go down at D4. Cross the first diagonal at its middle.
↑ Up at B2 ↓ Down at D4Come up at D4 and go down at F6. Cross the second diagonal at its middle and compare the tension.
↑ Up at D4 ↓ Down at F6Each holding stitch must cross the laid strand and enter the ground on opposite sides of it.